An Camas Mòr - a proposed New Community in the Highlands of Scotland
 
 
                 
 
THE APPLICATION
 
Please download pdf reports from the list below. (Files over 1MB are indicated)
Please download Additional Information June 2009 pdf reports listed below. (Files over 1MB are indicated)
 
For quick access to the An Camas Mòr Block Plan click HERE(2 MB)
For quick access to the Proposed Masterplan Report click HERE (39 MB)
For quick access to the Additional Information Report June 2009 click HERE(6 MB)
 
Environmental Statement  
   
VOLUME 1 FIGURES
PREFACE Section 1
Viewing the Environmental Statement Figure 1.1: Pertinent Geological/Geomorphological
Features of the An Camas
Mòr Site
Copies of the Environmental Statement
  Section 2
NON-TECHNICAL SUMMARY Figure 2.1: Landscape Context
  Figure 2.2: Cairngorms National Park Boundary
GLOSSARY Figure 2.3: Local Landscape Character Areas
  Figure 2.4: Landscape character of the Wider Setting
ABBREVIATIONS Figure 2.5: Landscape Designations
  Section 3
CHAPTER 1 THE APPLICATION Figure 3.1: Visual Context
The Application Figure 3.2: Visual Character of the Site
Context for the Application Figure 3.3: Existing Tree Heights at Assessment Period O
Further Consents Figure 3.4: View Point Locations
Environmental Impact Assessment Figure 3.5: Bare Ground - ZTV - Assessment Period D
Structure of the Environmental Statement Figure 3.6: With Trees - ZTV - Assessment Period A
  Figure 3.7: With Trees - ZTV - Assessment Period B
CHAPTER 2 BACKGROUND Figure 3.8: With Trees - ZTV - Assessment Period C
Introduction Figure 3.9: With Trees - ZTV - Assessment Period D
The Framework Plan Figure 3.10: VP 1 - Assessment Period A
The Highland Council Study of Alternatives 1990 Figure 3.11: VP 1 - Assessment Period B
Final Draft Local Plan 1992 Figure 3.12: VP 1 - Assessment Period C
Public Local Inquiry 1994 Figure 3.13: VP 1 - Assessment Period D
Badenoch and Strathspey Local Plan 1997 Figure 3.14: VP 1 - Assessment Period 2070
An Camas Mòr Action Group 1999 Figure 3.15: VP 2 - Assessment Period A
Background Report Figure 3.16: VP 2 - Assessment Period B
Feasibility Study Figure 3.17: VP 2 - Assessment Period C
Technical Effectiveness Study Figure 3.18: VP 2 - Assessment Period D
The Initial Masterplan Process Figure 3.19: VP 2 - Assessment Period 2070
Briefing Note to the Environmental Impact Assessment Team Figure 3.20: VP 3 - Assessment Period A
Scope of Environmental Impact Assessment Figure 3.21: VP 3 - Assessment Period B
Scope of Proposed Masterplan Figure 3.22: VP 3 - Assessment Period C
Workshops and Consultations Figure 3.23: VP 3 - Assessment Period D
Supporting Documents: Figure 3.24: VP 3 - Assessment Period 2070
Masterplan Report (39 MB) Figure 3.25: VP 4 - Assessment Period A
Indicative Land Use Plan Strategies (4 MB) Figure 3.26: VP 4 - Assessment Period B
Design and Access Statement (3 MB) Figure 3.27: VP 4 - Assessment Period C
Planning Statement (3 MB) Figure 3.28: VP 4 - Assessment Period D
Flood Risk Assessment (6 MB) Figure 3.29: VP 4 - Assessment Period 2070
Transport Assessment 1.1 Introduction Figure 3.30: VP 5 - Assessment Period A
Transport Assessment 1.2 Policy Examination Figure 3.31: VP 5 - Assessment Period B
Transport Assessment 1.3 Existing Situation Figure 3.32: VP 5 - Assessment Period C
Transport Assessment 1.4 The Proposed Development Figure 3.33: VP 5 - Assessment Period D
Transport Assessment 1.5 Travel Plan Framework Figure 3.34: VP 5 - Assessment Period 2070
Transport Assessment 1.6 Person Trip Generation, Modal Choice and Person Trip
Distribution
Figure 3.35: VP 6 - Assessment Period A
Figure 3.36: VP 6 - Assessment Period B
Transport Assessment 1.7 Road Traffic Generation, Distribution, Assignment and
Impact Assessment - 2028
Figure 3.37: VP 6 - Assessment Period C
Figure 3.38: VP 6 - Assessment Period D
Transport Assessment 1.8 Road Traffic Generation, Distribution, Assignment and
Impact Assessment for the Intermediate Assessment Periods
Figure 3.39: VP 6 - Assessment Period 2070
Figure 3.40: VP 7 - Assessment Period A
Transport Assessment 1.9 Summary and Conclusions Figure 3.41: VP 7 - Assessment Period B
Transport Assessment Appendix 1 Residential Figure 3.42: VP 7 - Assessment Period C
Transport Assessment Appendix 1 Hotel Figure 3.43: VP 7 - Assessment Period D
Transport Assessment Appendix 1 Primary School Figure 3.44: VP 7 - Assessment Period 2070
Transport Assessment Appendix 1 Nursing Home Figure 3.45: VP 8 - Assessment Period A
Transport Assessment Appendix 1 Retail Figure 3.46: VP 8 - Assessment Period B
Transport Assessment Appendix 1 Commercial (Office) Figure 3.47: VP 8 - Assessment Period C
Transport Assessment Appendix 2 Traffic Survey Results Part 1 (4 MB) Figure 3.48: VP 8 - Assessment Period D
Transport Assessment Appendix 2 Traffic Survey Results Part 2 (6 MB) Figure 3.49: VP 8 - Assessment Period 2070
Transport Assessment Appendix 3 Existing and Projected Peak Period Network Traffic Flows Figure 3.50: VP 9 - Assessment Period A
Socio-Economic Impact Assessment (5 MB) Figure 3.51: VP 9 - Assessment Period B
Sustainability Appraisal (3 MB) Figure 3.52: VP 9 - Assessment Period C
Public Consultation Document (3 MB) Figure 3.53: VP 9 - Assessment Period D
Summary Figure 3.54: VP 9 - Assessment Period 2070
  Figure 3.55: VP 10 - Assessment Period A
  Figure 3.56: VP 10 - Assessment Period B
CHAPTER 3 PLANNING CONTEXT Figure 3.57: VP 10 - Assessment Period C
Introduction Figure 3.58: VP 10 - Assessment Period D
Scottish Planning Policy Figure 3.59: VP 10 - Assessment Period 2070
Local Planning Policy Figure 3.60: VP 11 - Assessment Period A
Badenoch & Strathspey Local Plan Figure 3.61: VP 11 - Assessment Period B
Cairngorms National Park Local Plan Figure 3.62: VP 11 - Assessment Period C
The Planning Process Figure 3.63: VP 11 - Assessment Period D
  Figure 3.64: VP 11 - Assessment Period 2070
CHAPTER 4 ENVIRONMENTAL CONTEXT Figure 3.65: VP 12 - Assessment Period A
The Site Figure 3.66: VP 12 - Assessment Period B
Site History Figure 3.67: VP 12 - Assessment Period C
Site Character Figure 3.68: VP 12 - Assessment Period D
Site Protection Figure 3.69: VP 12 - Assessment Period 2070
Protected Species Figure 3.70: VP 13- Assessment Period A
Development of the Area Figure 3.71: VP 13 - Assessment Period B
Conclusion Figure 3.72: VP 13- Assessment Period C
  Figure 3.73: VP 13 - Assessment Period D
CHAPTER 5 THE PROPOSED DEVELOPMENT Figure 3.74: VP 13 - Assessment Period 2070
Introduction Section 4
Vision Figure 4.1: Area Plan
Development Periods Figure 4.2: Natural Vegetation Classification Communities
for Key Habitats
Indicative Land Use Plan Strategies Summaries
Woodland Management Figure 4.3: Statutory Designated Sites for Nature
Conservation
Construction Activities Figure 4.4: Ancient Woodland Inventory Sites
Construction of Scheme and Enabling Works Figure 4.5: Habitat Types Present within the wider Study Area
and the Core Areas
Topsoil, Subsoil and Excavated Material - Storage and Reuse
Roads, Traffic and Access Figure 4.6: Target Note Locations for Non-confidential
Protected Mammal Species
Strategies
  Figure 4.7: Habitat Types Related to the Proposed
Development Periods
CHAPTER 6 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT
Introduction Section 5
Structure of the ES Figure 5.1: Cultural Heritage Sites in the An Camas Mòr Study Area
The Environmental Impact Assessment Regulations
The Overall EIA Process Figure 5.2: Cultural Heritage Receptors Where Effect on
Setting Assessed
The Approach to EIA
The Detailed EIA Process Section 6
Scoping Figure 6.1: Proposed Development Site and 200m Boundary
EIA Assessment Periods Figure 6.2: DMRB Human Health Receptors
EIA Basis Section 8
  Figure 8.1: Number and Direction of Views
CHAPTER 7 SUMMARY OF ASSESSMENTS OF EFFECTS Figure 8.2: Night Time Character Views
Section 1: Introduction Figure 8.3: Views 1, 2 and 3
Section 2: Possible Impacts Figure 8.4: Views 4, 5
Section 3: Effect on Geology & Soils Figure 8.5: Views 6, 7, 8
Section 4: Effect on the Landscape Resource Figure 8.6: Views 9, 10
Section 5: Effect on Visual Amenity Figure 8.7: Views 11, 12, 13
Section 6: Effect on Ecology and Nature Conservation Figure 8.8: Mitigation Planting
Section 7: Effect on Cultural Heritage Section 10
Section 8: Effect on Air Quality Figure 10.1: Tourism Location Map 1
Section 9: Effect of Noise and Vibration Figure 10.2: Tourism Location Map 2
Section 10: Effect of Night Lighting Figure 10.3: Tourism Location Map 3
Section 11: Effect on Hydrology and Water Quality Figure 10.4: Tourism Location Map 4
Section 12: Effect on Socio-Economic, Community Impact and Tourism and Recreation Figure 10.5: Tourism Location Map 5
Section 13: Cumulative and Inter-related Effects Figure 10.6: Tourism Location Map 6
Section 14: Summary of Effects Figure 10.7: Tourism Location Map 7
  Figure 10.8: Tourism Location Map 8
CHAPTER 8 SCHEDULE OF ENVIRONMENTAL COMMITMENTS Figure 10.9: Tourism Location Map 9
  Figure 10.10: Tourism Location Map 10
APPENDIX 1: PROJECT TEAM Figure 10.11: Tourism Location Map 11
  Figure 10.12: Tourism Location Map 12
  Figure 10.13: Tourism Location Map 13
VOLUME 2 Figure 10.14: Tourism Location Map 14
CHAPTER 9 TECHNICAL APPENDICES Figure 10.15: Tourism Location Map 15
Geology & Soils Figure 10.16: Tourism Location Map 16
Landscape Resource Figure 10.17: Tourism Location Map 17
Visual Amenity Figure 10.18: Tourism Location Map 18
Ecology and Nature Conservation Figure 10.19: Tourism Location Map 19
Cultural Heritage Figure 10.20: Tourism Location Map 20
Air Quality Figure 10.21: Tourism Location Map 21
Noise and Vibration  
Night Lighting  
Hydrology and Water Quality APPENDICES
Socio-Economic, Community Impact and Tourism and Recreation Appendix A: Landscape and Visual Impact Assessment
Methodology
 
  Appendix B: Ecology & Nature Conservation: 4A
VOLUME 3 Appendix B: Ecology & Nature Conservation:4B
CHAPTER 10 REPORT OF ENVIRONMENTAL IMPACT ASSESSMENT SCOPING Appendix B: Ecology & Nature Conservation:4C
CONSULTATION Appendix B: Ecology & Nature Conservation:4D
Part 1 Section 1 (4 MB) Appendix B: Ecology & Nature Conservation:4E
Part 2 Section 1 Geology and Soils Appendix B: Ecology & Nature Conservation: 4F(2 MB)
Part 2 Section 2 Landscpe Resource and Visular Amenity Appendix B: Ecology & Nature Conservation: 4G(3 MB)
Part 2 Section 3 Ecology and Nature Conservation Appendix B: Ecology & Nature Conservation: 4H
Part 2 Section 4 Cultural Heritage Appendix B: Ecology & Nature Conservation: 4I(2 MB)
Part 2 Section 5 Air Quality Appendix B: Ecology & Nature Conservation :4J
Part 2 Section 6 Noise Appendix B: Ecology & Nature Conservation: 4K
Part 2 Section 7 Night Lighting Appendix B: Ecology & Nature Conservation: 4L
Part 2 Section 8 Hydrology and Water Quality Appendix C: Characterisation of the Settings of Cultural
Heritage Features
Part 2 Section 9 Socio-economic, Community Impact and Tourism and Recreation
References Appendix D: DMRB Results for Human Health Receptors
  Appendix E: Glossary of Acoustic Terms
   
VOLUME 5  
CHAPTER 12 INFORMATION TO INFORM APPROPRIATE ASSESSMENT ANNEX
  Annex A: Application Site Plan, Block Plan and Indicative Land Use Plans (A3 Versions) (3 MB)
 
   
ADDITIONAL INFORMATION REPORT JUNE 2009  
Section A: Additional Information Relating to the Text
Section B: Additional Information Relating to Formatting, Numbering and Spelling Errata
Section C: Environmental Statement Volume 2 Section 3 - Visual Amenity: Additional Information (5 MB)
Section D: Environmental Statement Volume 1 Chapter 7 Summary of Assessment of Effects Section 7.7 - Cultural Heritage: Additional Information relating to
habitat compensation areas
Section E: Environmental Statement Volume 2 Section 5 - Cultural Heritage: Additional paragraphs relating to habitat compensation areas
Section F: Environmental Statement Volume 2 Section 5 - Cultural Heritage: Additional References
 
APPENDICES
Appendix 1: Environmental Statement, Volume 1, Chaper 5.6 Construction Activities: Revised Replacement Table A.1
Appendix 2: Supporting Documents, Indicative Land Use Plan Strategies, Section 1.7 Services Strategy; Revised Replacement Tables 1.3, 1.4 and Additional
Information: Options for A Telecoms Strategy
Appendix 3: Supporting Document, Sustainability Appraisal, Appendix A: Revised Replacement Text
 
ADDITONAL INFORMATION 23 MARCH 2010
Second Submission - 23/03/10 (4 MB)
Supplementary Info 2 Letter - 23/03/10
 
 
Design Team Draft Documents (Protected)