| VOLUME 1 |
FIGURES |
| PREFACE |
Section 1 |
| Viewing the Environmental Statement |
Figure 1.1: Pertinent Geological/Geomorphological
Features of the An Camas Mòr Site |
| Copies of the Environmental Statement |
| |
Section 2 |
| NON-TECHNICAL SUMMARY |
Figure 2.1: Landscape Context
|
| |
Figure 2.2: Cairngorms National Park Boundary |
| GLOSSARY |
Figure 2.3: Local Landscape Character Areas |
| |
Figure 2.4: Landscape character of the Wider Setting |
| ABBREVIATIONS |
Figure 2.5: Landscape Designations |
| |
Section 3 |
| CHAPTER 1 THE APPLICATION |
Figure 3.1: Visual Context |
| The Application |
Figure 3.2: Visual Character of the Site |
| Context for the Application |
Figure 3.3: Existing Tree Heights at Assessment Period O |
| Further Consents |
Figure 3.4: View Point Locations |
| Environmental Impact Assessment |
Figure 3.5: Bare Ground - ZTV - Assessment Period D |
| Structure of the Environmental Statement |
Figure 3.6: With Trees - ZTV - Assessment Period A |
| |
Figure 3.7: With Trees - ZTV - Assessment Period B |
| CHAPTER 2 BACKGROUND |
Figure 3.8: With Trees - ZTV - Assessment Period C |
| Introduction |
Figure 3.9: With Trees - ZTV - Assessment Period D |
| The Framework Plan |
Figure 3.10: VP 1 - Assessment Period A |
| The Highland Council Study of Alternatives 1990 |
Figure 3.11: VP 1 - Assessment Period B |
| Final Draft Local Plan 1992 |
Figure 3.12: VP 1 - Assessment Period C |
| Public Local Inquiry 1994 |
Figure 3.13: VP 1 - Assessment Period D |
| Badenoch and Strathspey Local Plan 1997 |
Figure 3.14: VP 1 - Assessment Period 2070 |
| An Camas Mòr Action Group 1999 |
Figure 3.15: VP 2 - Assessment Period A |
| Background Report |
Figure 3.16: VP 2 - Assessment Period B |
| Feasibility Study |
Figure 3.17: VP 2 - Assessment Period C |
| Technical Effectiveness Study |
Figure 3.18: VP 2 - Assessment Period D |
| The Initial Masterplan Process |
Figure 3.19: VP 2 - Assessment Period 2070 |
| Briefing Note to the Environmental Impact Assessment Team |
Figure 3.20: VP 3 - Assessment Period A |
| Scope of Environmental Impact Assessment |
Figure 3.21: VP 3 - Assessment Period B |
| Scope of Proposed Masterplan |
Figure 3.22: VP 3 - Assessment Period C |
| Workshops and Consultations |
Figure 3.23: VP 3 - Assessment Period D |
| Supporting Documents: |
Figure 3.24: VP 3 - Assessment Period 2070 |
| Masterplan Report (39 MB) |
Figure 3.25: VP 4 - Assessment Period A |
| Indicative Land Use Plan Strategies (4 MB) |
Figure 3.26: VP 4 - Assessment Period B |
| Design and Access Statement (3 MB) |
Figure 3.27: VP 4 - Assessment Period C |
| Planning Statement (3 MB) |
Figure 3.28: VP 4 - Assessment Period D |
| Flood Risk Assessment (6 MB) |
Figure 3.29: VP 4 - Assessment Period 2070 |
| Transport Assessment 1.1 Introduction |
Figure 3.30: VP 5 - Assessment Period A |
| Transport Assessment 1.2 Policy Examination |
Figure 3.31: VP 5 - Assessment Period B |
| Transport Assessment 1.3 Existing Situation |
Figure 3.32: VP 5 - Assessment Period C |
| Transport Assessment 1.4 The Proposed Development |
Figure 3.33: VP 5 - Assessment Period D |
| Transport Assessment 1.5 Travel Plan Framework |
Figure 3.34: VP 5 - Assessment Period 2070 |
Transport Assessment 1.6 Person Trip Generation, Modal Choice and Person Trip
Distribution |
Figure 3.35: VP 6 - Assessment Period A |
| Figure 3.36: VP 6 - Assessment Period B |
Transport Assessment 1.7 Road Traffic Generation, Distribution, Assignment and
Impact Assessment - 2028 |
Figure 3.37: VP 6 - Assessment Period C |
| Figure 3.38: VP 6 - Assessment Period D |
Transport Assessment 1.8 Road Traffic Generation, Distribution, Assignment and
Impact Assessment for the Intermediate Assessment
Periods |
Figure 3.39: VP 6 - Assessment Period 2070 |
| Figure 3.40: VP 7 - Assessment Period A |
| Transport Assessment 1.9 Summary and Conclusions |
Figure 3.41: VP 7 - Assessment Period B |
| Transport Assessment Appendix 1 Residential |
Figure 3.42: VP 7 - Assessment Period C |
| Transport Assessment Appendix 1 Hotel |
Figure 3.43: VP 7 - Assessment Period D |
| Transport Assessment Appendix 1 Primary School |
Figure 3.44: VP 7 - Assessment Period 2070 |
| Transport Assessment Appendix 1 Nursing Home |
Figure 3.45: VP 8 - Assessment Period A |
| Transport Assessment Appendix 1 Retail |
Figure 3.46: VP 8 - Assessment Period B |
| Transport Assessment Appendix 1 Commercial (Office) |
Figure 3.47: VP 8 - Assessment Period C |
| Transport Assessment Appendix 2 Traffic Survey Results Part 1 (4 MB) |
Figure 3.48: VP 8 - Assessment Period D |
| Transport Assessment Appendix 2 Traffic Survey Results Part 2 (6 MB) |
Figure 3.49: VP 8 - Assessment Period 2070 |
| Transport Assessment Appendix 3 Existing and Projected Peak Period Network Traffic Flows |
Figure 3.50: VP 9 - Assessment Period A |
| Socio-Economic Impact Assessment (5 MB) |
Figure 3.51: VP 9 - Assessment Period B |
| Sustainability Appraisal (3 MB) |
Figure 3.52: VP 9 - Assessment Period C |
| Public Consultation Document (3 MB) |
Figure 3.53: VP 9 - Assessment Period D |
| Summary |
Figure 3.54: VP 9 - Assessment Period 2070 |
| |
Figure 3.55: VP 10 - Assessment Period A |
| |
Figure 3.56: VP 10 - Assessment Period B |
| CHAPTER 3 PLANNING CONTEXT |
Figure 3.57: VP 10 - Assessment Period C |
| Introduction |
Figure 3.58: VP 10 - Assessment Period D |
| Scottish Planning Policy |
Figure 3.59: VP 10 - Assessment Period 2070 |
| Local Planning Policy |
Figure 3.60: VP 11 - Assessment Period A |
| Badenoch & Strathspey Local Plan |
Figure 3.61: VP 11 - Assessment Period B |
| Cairngorms National Park Local Plan |
Figure 3.62: VP 11 - Assessment Period C |
| The Planning Process |
Figure 3.63: VP 11 - Assessment Period D |
| |
Figure 3.64: VP 11 - Assessment Period 2070 |
| CHAPTER 4 ENVIRONMENTAL CONTEXT |
Figure 3.65: VP 12 - Assessment Period A |
| The Site |
Figure 3.66: VP 12 - Assessment Period B |
| Site History |
Figure 3.67: VP 12 - Assessment Period C |
| Site Character |
Figure 3.68: VP 12 - Assessment Period D |
| Site Protection |
Figure 3.69: VP 12 - Assessment Period 2070 |
| Protected Species |
Figure 3.70: VP 13- Assessment Period A |
| Development of the Area |
Figure 3.71: VP 13 - Assessment Period B |
| Conclusion |
Figure 3.72: VP 13- Assessment Period C |
| |
Figure 3.73: VP 13 - Assessment Period D |
| CHAPTER 5 THE PROPOSED DEVELOPMENT |
Figure 3.74: VP 13 - Assessment Period 2070 |
| Introduction |
Section 4 |
| Vision |
Figure 4.1: Area Plan |
| Development Periods |
Figure 4.2: Natural Vegetation Classification Communities
for Key Habitats |
| Indicative Land Use Plan Strategies Summaries |
| Woodland Management |
Figure 4.3: Statutory Designated Sites for Nature
Conservation |
| Construction Activities |
Figure 4.4: Ancient Woodland Inventory Sites |
| Construction of Scheme and Enabling Works |
Figure 4.5: Habitat Types Present within the wider Study Area
and the Core Areas
|
| Topsoil, Subsoil and Excavated Material - Storage and Reuse |
| Roads, Traffic and Access |
Figure 4.6: Target Note Locations for Non-confidential
Protected Mammal Species |
| Strategies |
| |
Figure 4.7: Habitat Types Related to the Proposed
Development Periods |
| CHAPTER 6 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT |
| Introduction |
Section 5 |
| Structure of the ES |
Figure 5.1: Cultural Heritage Sites in the An Camas Mòr
Study Area |
| The Environmental Impact Assessment Regulations |
| The Overall EIA Process |
Figure 5.2: Cultural Heritage Receptors Where Effect on
Setting Assessed |
| The Approach to EIA |
| The Detailed EIA Process |
Section 6
|
| Scoping |
Figure 6.1: Proposed Development Site and 200m Boundary |
| EIA Assessment Periods |
Figure 6.2: DMRB Human Health Receptors |
| EIA Basis |
Section 8 |
| |
Figure 8.1: Number and Direction of Views |
| CHAPTER 7 SUMMARY OF ASSESSMENTS OF EFFECTS |
Figure 8.2: Night Time Character Views |
| Section 1: Introduction |
Figure 8.3: Views 1, 2 and 3 |
| Section 2: Possible Impacts |
Figure 8.4: Views 4, 5 |
| Section 3: Effect on Geology & Soils |
Figure 8.5: Views 6, 7, 8 |
| Section 4: Effect on the Landscape Resource |
Figure 8.6: Views 9, 10 |
| Section 5: Effect on Visual Amenity |
Figure 8.7: Views 11, 12, 13 |
| Section 6: Effect on Ecology and Nature Conservation |
Figure 8.8: Mitigation Planting |
| Section 7: Effect on Cultural Heritage |
Section 10 |
| Section 8: Effect on Air Quality |
Figure 10.1: Tourism Location Map 1 |
| Section 9: Effect of Noise and Vibration |
Figure 10.2: Tourism Location Map 2 |
| Section 10: Effect of Night Lighting |
Figure 10.3: Tourism Location Map 3 |
| Section 11: Effect on Hydrology and Water Quality |
Figure 10.4: Tourism Location Map 4 |
| Section 12: Effect on Socio-Economic, Community Impact and Tourism and Recreation |
Figure 10.5: Tourism Location Map 5 |
| Section 13: Cumulative and Inter-related Effects |
Figure 10.6: Tourism Location Map 6 |
| Section 14: Summary of Effects |
Figure 10.7: Tourism Location Map 7 |
| |
Figure 10.8: Tourism Location Map 8 |
| CHAPTER 8 SCHEDULE OF ENVIRONMENTAL COMMITMENTS |
Figure 10.9: Tourism Location Map 9 |
| |
Figure 10.10: Tourism Location Map 10 |
| APPENDIX 1: PROJECT TEAM |
Figure 10.11: Tourism Location Map 11 |
| |
Figure 10.12: Tourism Location Map 12 |
| |
Figure 10.13: Tourism Location Map 13 |
| VOLUME 2 |
Figure 10.14: Tourism Location Map 14 |
| CHAPTER 9 TECHNICAL APPENDICES |
Figure 10.15: Tourism Location Map 15 |
| Geology & Soils |
Figure 10.16: Tourism Location Map 16 |
| Landscape Resource |
Figure 10.17: Tourism Location Map 17 |
| Visual Amenity |
Figure 10.18: Tourism Location Map 18 |
| Ecology and Nature Conservation |
Figure 10.19: Tourism Location Map 19 |
| Cultural Heritage |
Figure 10.20: Tourism Location Map 20 |
| Air Quality |
Figure 10.21: Tourism Location Map 21 |
| Noise and Vibration |
|
| Night Lighting |
|
| Hydrology and Water Quality |
APPENDICES |
| Socio-Economic, Community Impact and Tourism and Recreation |
Appendix A: Landscape and Visual Impact Assessment
Methodology |
| |
| |
Appendix B: Ecology & Nature Conservation: 4A |
| VOLUME 3 |
Appendix B: Ecology & Nature Conservation:4B |
| CHAPTER 10 REPORT OF ENVIRONMENTAL IMPACT ASSESSMENT SCOPING |
Appendix B: Ecology & Nature Conservation:4C |
| CONSULTATION |
Appendix B: Ecology & Nature Conservation:4D |
| Part 1 Section 1 (4 MB) |
Appendix B: Ecology & Nature Conservation:4E |
| Part 2 Section 1 Geology and Soils |
Appendix B: Ecology & Nature Conservation: 4F(2 MB) |
| Part 2 Section 2 Landscpe Resource and Visular Amenity |
Appendix B: Ecology & Nature Conservation: 4G(3 MB) |
| Part 2 Section 3 Ecology and Nature Conservation |
Appendix B: Ecology & Nature Conservation: 4H |
| Part 2 Section 4 Cultural Heritage |
Appendix B: Ecology & Nature Conservation: 4I(2 MB) |
| Part 2 Section 5 Air Quality |
Appendix B: Ecology & Nature Conservation :4J |
| Part 2 Section 6 Noise |
Appendix B: Ecology & Nature Conservation: 4K |
| Part 2 Section 7 Night Lighting |
Appendix B: Ecology & Nature Conservation: 4L |
| Part 2 Section 8 Hydrology and Water Quality |
Appendix C: Characterisation of the Settings of Cultural
Heritage Features |
| Part 2 Section 9 Socio-economic, Community Impact and Tourism and Recreation |
| References |
Appendix D: DMRB Results for Human Health Receptors |
| |
Appendix E: Glossary of Acoustic Terms |
| |
|
| VOLUME 5 |
|
| CHAPTER 12 INFORMATION TO INFORM APPROPRIATE ASSESSMENT |
ANNEX |
| |
Annex A: Application Site Plan, Block Plan and Indicative Land Use Plans (A3 Versions) (3 MB) |
| |
| |
|
| Section A: Additional Information Relating to the Text |
| Section B: Additional Information Relating to Formatting, Numbering and Spelling Errata |
| Section C: Environmental Statement Volume 2 Section 3 - Visual Amenity: Additional Information (5 MB) |
Section D: Environmental Statement Volume 1 Chapter 7 Summary of Assessment of Effects Section 7.7 - Cultural Heritage: Additional Information relating to
habitat compensation areas |
| Section E: Environmental Statement Volume 2 Section 5 - Cultural Heritage: Additional paragraphs relating to habitat compensation areas |
| Section F: Environmental Statement Volume 2 Section 5 - Cultural Heritage: Additional References |
| |
| APPENDICES |
| Appendix 1: Environmental Statement, Volume 1, Chaper 5.6 Construction Activities: Revised Replacement Table A.1 |
Appendix 2: Supporting Documents, Indicative Land Use Plan Strategies, Section 1.7 Services Strategy; Revised Replacement Tables 1.3, 1.4 and Additional
Information: Options for A Telecoms Strategy |
| Appendix 3: Supporting Document, Sustainability Appraisal, Appendix A: Revised Replacement Text |
| |
| Second Submission - 23/03/10 (4 MB) |
| Supplementary Info 2 Letter - 23/03/10 |
| |
| |